GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
Chapter 3 - System Setup
3 - 5
Section 3-3
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
CAUTION
Do not lift the unit by the Keyboard. Equipment damage may result.
CAUTION
The crate with the LOGIQ V5/LOGIQ V3 weighs approximately 50kg. Be prepared for a sudden
shift of weight as the unit is removed from its base (pallet)
Table 3-4:
Unpacking the equipment
Step
Description
Corresponding Graphic
1
Tear the stop open mark.
2
Cut the two packing straps around the crate.
Note: To avoid injury, with one hand holding the
strap clasp when cutting the strap.
3
Remove the top cover of the shipping box.
Summary of Contents for LOGIQ V3
Page 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3 ...
Page 2: ......
Page 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO ...
Page 27: ......
Page 145: ......
Page 169: ......