background image

Critical Power 

 

Modifications reserved 

Page 2/43 

GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx 

Installation Guide 

LP33 Series 20 & 30 UL S2

 

 

 

 

Model: 

LP33 Series 20 & 30 UL S2 

Issued by: 

Product Document Department – Riazzino - CH

 

Approved by: 

R & D Department – Riazzino - CH 

Date of issue: 

04/22/2016 

File name: 

GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010 

Revision: 

1.0 

Identification No.: 

1024203 

 
 
 
 
 
 
 
 
 
 
 
 
 

Up-dating 

 

 

Revision 

Concerns 

Date 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 

COPYRIGHT © 2016 by 

GE Critical Power 

 
All rights reserved. 
The information contained in this publication is intended solely for the purposes indicated. 
The  present  publication  and  any  other  documentation  supplied  with  the  UPS  system  is  not  to  be 

reproduced, either in part or in its entirety, without the prior written consent of 

GE

The illustrations and plans describing the equipment are intended as general reference only and are 
not necessarily complete in every detail. 
The content of this publication may be subject to modification without prior notice. 
 

 

Summary of Contents for lp33 20 series

Page 1: ...ide Uninterruptible Power Supply GE Consumer Industrial SA General Electric Company CH 6595 Riazzino Locarno Switzerland T 41 0 91 850 51 51 F 41 0 91 850 52 52 www gecriticalpower com imagination at work LPS33U_020 030_S2_UPS_GE_01 ...

Page 2: ...evision Concerns Date COPYRIGHT 2016 by GE Critical Power All rights reserved The information contained in this publication is intended solely for the purposes indicated The present publication and any other documentation supplied with the UPS system is not to be reproduced either in part or in its entirety without the prior written consent of GE The illustrations and plans describing the equipmen...

Page 3: ...installation of the UPS Thank you for choosing GE START UP AND COMMISSIONING A GE Critical Power Field Services Engineer must perform start up and commissioning of the UPS Please Contact GE Services at least two weeks prior to schedule start up and commissioning at 1 800 637 1738 or by E mail at 1Hpqservice ge com Distributed in the USA by Your service contact g GE Consumer Industrial SA General E...

Page 4: ... is a product that needs to be installed by a licensed and knowledgeable contractor We recommend that this manual be kept next to the UPS for future references If any problems are encountered with the procedures contained in this manual please contact your Service Center before you proceed This document shall not be copied or reproduced without the permission of GE Some of the information containe...

Page 5: ...RING 21 4 7 1 Utility input connection 21 4 7 2 Input output over current protection and wire sizing 22 4 7 3 Battery over current protection and wire sizing 23 4 7 4 General data table for current protection and wire sizing 24 4 8 WIRING CONNECTION 27 4 8 1 Power connections 27 4 9 ELECTRICAL CONNECTIONS 29 4 9 1 Common input utility 29 4 9 2 Dual input utility option 30 4 9 3 Battery connection ...

Page 6: ...lation maintenance and service work should be performed by QUALIFIED SERVICE PERSONNEL only The KNOWLEDGE and the FULL compliance of the safety instructions and warnings contained in this manual are THE ONLY CONDITION to avoid any dangerous situations during installation operation maintenance work and to preserve the maximum reliability of the UPS system NOTE LP33 Series 20 30 is an FCC Class A UP...

Page 7: ...y during Commissioning and Maintenance of the UPS for the following Damaged components squeezed wires and cables or not correctly inserted plugs After removing the sidewalls of the UPS make sure that all earth connections when reassembling are correctly reattached This UPS is intended for use in a controlled indoor environment free of conductive contaminants and protected against animals intrusion...

Page 8: ...he objects can fall into the Battery Cabinet 2 Tools must have insulated handles and must be insulated so that they will not short Battery Terminals Do not allow a tool to short between individual or separate Battery Terminals or to the cabinet or rack Do not lay tools or metal parts on top of the Battery and do not lay them where they could fall onto the Battery or into the cabinet 3 Install the ...

Page 9: ...wing symbols are defined WARNING if instruction is not followed injury or serious equipment damage may occur CAUTION internal parts have dangerous voltage present Risk of electric shock PE Earth GND Ground PROTECTIVE GROUNDING TERMINAL A terminal which must be connected to earth ground prior to making any other connection to the equipment A terminal to which or from which an alternating sine wave ...

Page 10: ...ables CI Customer Interface Board optional Q1 UPS output switch Q2 Manual bypass switch RC Relay card RPA RPA parallel board optional SNMP 3 ph SNMP WEB plug in adapter option X1 Terminals for common mains input connection rectifier bypass X2 Terminals in case of dual mains input optional X3 Terminals for load output connection X4 Terminals for external battery connection LPS33U_020 030_S2_UPS_GE_...

Page 11: ...d PACKING MATERIAL RECYCLING GE in compliance with environment protection uses only environmentally friendly material UPS packing materials must be recycled in compliance with all applicable regulations RECYCLING AT THE END OF SERVICE LIFE GE in compliance with environment protection recommends to the User that the UPS equipment at the end of its service life must be recovered conforming to the lo...

Page 12: ...the UPS pay attention to Forklift Crane Fig 4 1 1 LP33 Series 30 40 lifting Forklift The UPS may be lifted with a forklift in upright position from right and left side Take note of the center of gravity marked on the package NOTE Check for sufficient floor and elevator loading capacity Transport UPS only in upright position Do not stack other package on top of the UPS Crane If the UPS has to be li...

Page 13: ... x H 23 62 x 29 32 x 75 00 600 x 745 x 1905 mm 23 62 x 29 32 x 75 00 600 x 745 x 1905 mm UPS floor loading 97 lbs sq ft 472 kg m 2 103 lbs sq ft 499 kg m 2 UPS with standard shipping 827 lbs 375 kg 871 lbs 395 kg NOTE The weight of each single piece is marked outside the package LPS33U_020 030_S2_UPS dimensions_01 0 52 13 3mm 28 54 29 32 725mm 744 8mm 23 62 600m 75 00 1905mm CENTER OF GRAVITY 37 1...

Page 14: ...p battery located on the Control Unit board If the storage time of the UPS exceeds 1 year these functions should be verified by an authorized Service Center before putting the UPS into operation NOTE In case of storage of the UPS pay attention to 4 3 2 Storage of the battery In case of extended storage when the delivery includes maintenance free batteries keep in mind that they are subject to auto...

Page 15: ...oper cooling air exhaust the recommended minimum clearance between ceiling and top of the UPS is 16 400mm Battery cabinets must be placed beside the left side of the UPS cabinet A single phase power outlet 208Vac should be provided near the UPS for connection of power tools test equipment or connectivity devices This outlet must be grounded The LP33 Series 20 30 UPS can radiate radio frequency ene...

Page 16: ...ations show Positioning of the UPS cabinet Fig 4 4 3 Bolts for stabilizing the cabinet LP33 Series 20 30 is equipped with wheels for easy placement of the UPS To make the UPS movable on wheels the bolts on each leg of the cabinet have to be turned counter clockwise until they are free from the floor and thus the cabinet supported on wheels After having positioned the UPS at its final location the ...

Page 17: ...Positioning of the LP33 Series 20 30 Parallel System Fig 4 4 4 RPA Parallel System disposition In case of Parallel System try to place the UPS modules in sequence of their numbers marked on the packing If the units are positioned side by side the side panels must be mounted on all units LPS33U_020 030_S2_RPA disposition_GE_01 1 2 3 4 ...

Page 18: ...acuation from UPS room The heat must be evacuated from the environment with a proper cooling ventilation system provided by the user Fig 4 5 2 Heat evacuation from UPS room Air volume and losses of the UPS The approximate minimum air volume needed to evacuate the heat generated by the UPS for inlet temperature max 35 C 95 F for the standard version at inverter nominal load with PF 0 8 lag and batt...

Page 19: ... A fixing the carton box 2 Remove package B and C Remove the protection D outside the cabinet and the accessories bag 3 Fig 4 6 1 LP33 Series 20 30 unpacking sequence Use a forklift to raise the UPS from the floor Remove the two wooden plates E NOTE Be aware of the heavy weight of the UPS in particular if already equipped with Batteries Included in the delivery you can find the following parts Con...

Page 20: ...never these devices show a possible anomaly the UPS shall not be commissioned Please contact your GE Service Center Fig 4 6 2 ShockWatch device Fig 4 6 3 TiltWatch device NOTE A damaged UPS must never be installed or connected to utility or battery In case of any damage sustained during the transport immediately inform the shipping agent A detailed report of the damage is necessary for any indemni...

Page 21: ...e any other input connection connect and check the grounding wire The UPS has availability of input terminations for the Rectifier and Bypass The unit may be powered from a common input source or dual input sources option Common input Rectifier Bypass Fig 4 7 1 1 Common Input Rectifier Bypass The same power source is to be used for both Bypass Supply and Rectifier Input input F1 Bear in mind that ...

Page 22: ...ormer the input protective devices should be sized to allow the transformer magnetization inrush current Caution when using four pole circuit breakers as protection A potential problem exists for situations with non linear loads The neutral current could be greater than the phase currents The three phase Utility power supply must be symmetrical with respect to ground due to the existence of voltag...

Page 23: ...n bus bars The delivery and installation of fuses and input output connections of the UPS are at the customer s expense unless agreed otherwise NOTE It is recommended to provide an additional length of the input output cables so that the UPS can be moved for maintenance purpose It is recommended to use flexible input output conductors with suitable length to admit a sufficient displacement 4 7 3 B...

Page 24: ...tion The AC values below are current ratings per phase These maximum and nominal ratings should be considered when choosing the appropriate AC over current protection device NEC National Electric Code Section 210 20 a rules must be applied DC current rating is the maximum battery discharge current which the UPS allows UPS Model AC Input AC Input Rectifier AC Input Bypass DC Input F1 F2 F3 F4 Nom M...

Page 25: ...ier AC Input Bypass DC Input F1 F2 F3 F4 LP33 Series 20 80 A 80 A 80 A 90 A LP33 Series 30 125 A 125 A 125 A 110 A Wire sizing according to NEC Section 210 20 a Table 310 16 Use 167 F 75 C copper wire Wiring requirements AC INPUT 3 Phase 4 wire plus Ground AC OUTPUT 3 Phase 4 wire plus Ground DC INPUT 3 wire positive negative and neutral plus Ground Maximum cable diameter that terminals can accept...

Page 26: ...10 30 35 40 25 30 35 8 40 50 55 30 40 45 6 55 65 75 40 50 60 4 70 85 95 55 65 75 3 85 100 110 65 75 85 2 95 115 130 75 90 100 1 110 130 150 85 100 115 1 0 125 150 170 100 120 135 2 0 145 175 195 115 135 150 3 0 165 200 225 130 155 175 4 0 195 230 260 150 180 205 250 215 255 290 170 205 230 300 240 285 320 190 230 255 350 260 310 350 210 250 280 400 280 335 380 225 270 305 500 320 380 430 260 310 3...

Page 27: ...king care to avoid risk of short circuit between different poles The grounding and neutral connection of the electrical system must be in accordance with local regulations In case of additional cabinets containing batteries input output transformers etc their ground terminals must be connected to the UPS main ground terminal Once the power cables have been connected re install the internal safety ...

Page 28: ...r A of the cabinet Remove the protection panel B Remove the bottom fascia cover C Rout cable through side channel cable entry Use appropriate knockout in top cover shown above Route cable through side channel as shown on left NOTE For top feed applications knock out appropriate holes in side channel cover for cable conduits See Fig 4 8 1 2 C A B LPS33U_020 030_S2_Connection_TEC_01 Q2 Q1 LPS33U_020...

Page 29: ...bypass Fig 4 9 1 2 Terminals for common input mains X1 Utility 1 Input utility connection L1 Rectifier Bypass Phase A L2 Rectifier Bypass Phase B L3 Rectifier Bypass Phase C N1 Utility Neutral PE Main Ground X3 Load Output load connection L1 Load Phase L1 L2 Load Phase L2 L3 Load Phase L3 N2 Load Neutral PE Load Ground Max rating X1 X2 and X3 terminals LP33 Series 30 1 0 AWG 70mm2 LP33 Series 40 4...

Page 30: ...er Phase C N1 Mains Neutral PE Main Ground X2 Mains 2 Bypass input utility connection L1 2 Bypass Phase A L2 2 Bypass Phase B L3 2 Bypass Phase C N Mains Neutral X3 Load Output load connection L1 Load Phase A L2 Load Phase B L3 Load Phase C N2 Load Neutral PE Load Ground Connect wire to the terminals by using appropriate tools and appropriate torque shown in Section 4 8 1 Max rating X1 X2 X3 and X...

Page 31: ... electromagnetic compliance the connection between the UPS and external Battery must be done by using a shielded cable or suitable shielded metal conduit UPS with standard cabinet battery Additional cabinet battery 16 93 430 mm X4 Battery Battery connection Negative pole of the battery 0 Central point of battery blocks Positive pole of the battery PE Battery cabinet ground Fig 4 9 3 2 Diagram batt...

Page 32: ...rol bus cables Fig 4 9 4 2 Bus connection RPA Parallel System Bus connection RPA Parallel System Connect the control bus cable between the parallel units as indicated in the diagram Fig 4 9 4 2 Provide that the connectors J3 and J4 are properly fixed with the included screws Fig 4 9 4 3 Connection to Board P16 NOTE The jumper JP1 JP2 JP3 must be removed only on the intermediate units where the con...

Page 33: ...e parallel units in separated protected conduit to avoid any accidental disruption Put in place the front screen B Fig 4 9 4 1 paying attention to not damaging the control bus cables It is important to place the units in sequence of their assigned number A unit number from 1 to 4 is defined by the setting of parameters and displayed on the control panel This number is also marked inside and outsid...

Page 34: ...ntenance purposes the critical load must also be powered down during this time When the set up parameters of the UPS are set for frequency converter the ECO Mode operation is automatically disabled The UPS delivered as frequency converter has the following differences Automatic bypass disabled by setting of dedicated parameter access protected by password reserved to service engineer The handle of...

Page 35: ...a Relay Card see Section 5 2 List of possible connectivity configurations on LP33 Series 20 30 Slot 1 J4 Slot 2 J3 Slot 3 J5 Slot 1 J4 Slot 2 J3 Relay Card standard Relay Card standard Advanced SNMP Card optional Relay Card standard Advanced SNMP Card optional Advanced SNMP Card optional Customer Interface optional Advanced SNMP Card optional Customer Interface optional LPS33U_020 030_S2_UPS conne...

Page 36: ... D female 9 pin Total remote management of the system using software GE Power Diagnostics GE Data Protection or GE Service Software for system protection and management of the UPS systems The serial port J27 RS232 is enabled on all the units of the Parallel System Serial port J27 RS232 connection to PC with RS232 1 1 cable DB9m DB9f Fig 5 1 2 Serial port J27 RS232 connection to PC LPS33U_020 030_S...

Page 37: ...put signals on voltage free contacts On terminals J3 or J4 connector 4 of the following 28 signals can be selected from the display access only with password SETUP SETUP LEVEL 2 SERVICE 0 No signal 15 Battery discharge 1 Buzzer 16 Manual bypass ON 2 General alarm NO 17 Rectifier ON 3 Load on mains 18 Inverter ON 4 Stop operation 19 Battery boost charge 5 Load on inverter 20 Battery earth fault 6 M...

Page 38: ...losed contact must be connected individually to each unit When activated this switch causes the immediate shut down of booster battery charger inverter and the contactors K4 K6 and K7 NOTE This procedure could imply a load shut down When the EPO has been activated the system must be restored as follows Press the push button EPO contact on X7 1 2 is closed again Press the key O Inverter OFF see Sec...

Page 39: ...rminals X1 and on connector J2 are in parallel and therefore not separated galvanically from each other The programmable signals on X1 and J2 will be disabled with Q1 open with the exception of the signals for 16 Manual bypass ON 24 Relay output ON 25 Relay output OFF 26 EPO X1 Output signals on voltage free contacts X1 1 2 3 NO C NC Utility failure X1 4 5 6 NO C NC Load on inverter X1 7 8 9 NO C ...

Page 40: ... by parameters access with password only when an external NO contact is closed on No function Inverter On Inverter OFF Generator ON Print all Status relay External bypass ON External battery fuses Voltage free contacts Max DC AC 24V 1 25A IEC 60950 SELV circuit Min signal level 5VDC 5mA Gen Set signaling If an Emergency generator set supplies the UPS in case of utility failure and the generator is...

Page 41: ...Normally Closed contact must be connected individually to each unit When activated this switch causes the immediate shut down of booster battery charger inverter and the contactors K4 K6 and K7 NOTE This procedure could imply a load shut down When the EPO has been activated the system must be restored as follows Press the push button EPO contact on X7 1 2 is closed again Press the key O Inverter O...

Page 42: ...g 6 1 2 Dimensions W x D x H 6 00 x27 64x74 50 152x702x1892mm Weight 66lbs 30kg Screw torque specifications M8x16 Tensilock 222Lb in 25Nm Routing of cables for Top Entry cabinet Fig 6 1 2 Routing of cables for Top Entry cabinet Remove side panel A to gain side access to the UPS for top cable entry Knock out appropriate holes in top plate B for top cable entry Terminate conduits to top panel B Rout...

Page 43: ...V010 docx Installation Guide LP33 Series 20 30 UL S2 7 NOTES 7 1 NOTES FORM It is recommended to note in this section Notes with date and short description all the operations performed on the UPS as maintenance components replacement abnormal situations etc Date Description Done by ...

Reviews: