APPENDIX B: INSTALLING AND CONNECTING DNP3 I/O MODULES
D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
GE INFORMATION
179
DNP3 I/O module (LV) connection to the Power Source
Connect the power supply to the last DNP3 I/O module in the chain.
The cable from J2 on the last DNP3 I/O module to the power source (GE part number 977-
0500) provides the connections shown in the wiring diagram of Figure 71.
Figure 71: Power cable 977-0500 wiring diagram
1
2
3
4
5
6
7
9
8
Not Connected
+ DC
- DC
+ V
- V
Not Connected
Power Supply
DB9 Male
Summary of Contents for Multilin D400
Page 12: ...12 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL PRODUCT SUPPORT ...
Page 28: ...28 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 1 BEFORE YOU START ...
Page 34: ...34 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 2 INSTALLING THE D400 ...
Page 88: ...88 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 5 POWERING UP THE D400 ...
Page 174: ...174 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX A STANDARDS PROTECTION ...
Page 184: ...184 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX C LIST OF ACRONYMS ...
Page 192: ...192 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL INDEX ...