D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
GE INFORMATION
89
D400 Substation Gateway
Chapter 6: Setting Up the D400
Setting Up the D400
When you receive your D400, it is configured with default communication settings. To
enable the D400 to communicate over your substation LAN you must change the settings
as required by your network.
Refer to the D400 online help and
D400 Software Configuration Guide
SWM0066 for
complete information on configuring the D400.
Start the D400
The tasks performed to set up the D400 for operation are:
•
“Task 1: Connect to the D400” on page 90
•
“Task 2: Create user accounts” on page 91
•
“Task 3: Change the root password” on page 91
•
“Task 4: Set up the network interface” on page 92
•
“Task 5: Create a supervisor password” on page 94
•
“Task 6: Set up secure web access” on page 94
•
“Task 7: Access the D400 HMI” on page 96
•
“Task 8: Test the network connection” on page 96
TIP
In the following procedures, the term “enter” indicates that the menu item number is typed
in and then the
Enter
key is pressed.
Summary of Contents for Multilin D400
Page 12: ...12 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL PRODUCT SUPPORT ...
Page 28: ...28 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 1 BEFORE YOU START ...
Page 34: ...34 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 2 INSTALLING THE D400 ...
Page 88: ...88 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 5 POWERING UP THE D400 ...
Page 174: ...174 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX A STANDARDS PROTECTION ...
Page 184: ...184 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX C LIST OF ACRONYMS ...
Page 192: ...192 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL INDEX ...