background image

5.

Additional Information

Proficy Logic Developer-PLC Getting Started 

GFK-1918 

PACSystems RX3i & RX7i CPU Reference Manual 

GFK-2222 

PACSystems RX3i & RX7i TCP/IP Ethernet Communications User’s Manual 

GFK-2224 

PACSystems TCP/IP Ethernet Communications Station Manager Manual 

GFK-2225 

PACSystems RX3i System Manual 

GFK-2314 

PACSystems RXi, RX3i, and RX7i Controller Secure Deployment Guide 

GFK-2830 

PACSystems RX3i Energy Pack IC695ACC402 Quick Start Guide 

GFK-2939 

PACSystems RX3i IC695CPE330 CPU Important Product Information 

GFK-2942 

PACSystems RX3i and RX7i CPU Programmer’s Reference Manual 

GFK-2950 

PACSystems HART Pass Through User Manual 

GFK-2929 

PACSystems Hot Standby CPU Redundancy User Manual 

GFK-2308 

PACSystems RX3i PROFINET IO Controller User Manual 

GFK-2571 

PROFINET I/O Devices Secure Deployment Guide 

GFK-2904 

User manuals, product updates and other information sources are available on the 

Support website,  

www.geautomation.com

 

under 

Controllers and IO

RX3i Controllers. 

GE’s Automation & Controls 
Contact Information 

Americas: 

1-800-433-2682 or 1-434-978-5100 

Global regional phone numbers are available on our web site  

Copyright © 2014-2016 General Electric Company. All Rights Reserved. 
* Trademark of General Electric Company and/or its subsidiaries. 
All other trademarks are property of their respective holders

GFK-2941E

 

g

 

www.geautomation.com

 

 

 

Summary of Contents for PACSystems* RX3i

Page 1: ...GE s Automation Controls Programmable Control Products PACSystems RX3i 1GHz 64MB CPU w Ethernet IC695CPE330 Quick Start Guide GFK 2941E May 2016 g...

Page 2: ...nding 10 3 Module Start up 11 3 1 You Will Need 11 3 2 Basic Installation Steps 11 3 3 Redundancy Configuration 12 3 4 PROFINET Controller Configuration 13 3 5 Backward Compatibility with CPU320 CRU32...

Page 3: ...telligent Option modules up to 32K I O points RX3i Hot Standby Redundancy CPU with support for PROFINET I O using IC695PNC001 PROFINET Controllers RX3i Hot Standby Redundancy with Ethernet EGD Genius...

Page 4: ...ty to transfer user programs and or data to and from USB 2 0 A type Removable Data Storage Devices RDSDs HART Pass Through allows the CPE330 to communicate HART asset management data between HART capa...

Page 5: ...RDSD to CPU Run Stop Switch Position A three position switch which operates as follows CPU and Sweep Mode Memory Protection Run I O The CPU runs with I O sweep enabled User program memory is read onl...

Page 6: ...fault tables CPU OK On Amber CPU indicating CPU320 CRU320 compatibility setting FORCE On Amber Refer to the section Backward Compatibility with CPU320 CRU320 CPU315 for more information RUN Blinking...

Page 7: ...connection detected at corresponding port 1Gbps lower On Amber LAN1 or Corresponding network data speed is 1 Gbps On Green LAN2 Off Corresponding network data speed is 100 Mbps or 10 Mbps 1 3 Etherne...

Page 8: ...th the PME programming software using the Service Request Transport Protocol SRTP a proprietary GE protocol used primarily for communication with the programmer To establish Ethernet communications be...

Page 9: ...o independent LANs The dedicated LAN1 port will be used for communications with plant level or supervisory layers The switched LAN2 will typically be used to communicate with devices within the manufa...

Page 10: ...ystem Verify that all components of the system have been received and that they agree with your order If the system received does not agree with your order contact Customer Care 2 2 Installation Locat...

Page 11: ...MPONENTS MAY IMPAIR SUITABILITY FOR CLASS I DIVISION 2 WARNING EXPLOSION HAZARD WHEN IN HAZARDOUS AREAS TURN OFF POWER BEFORE REPLACING OR WIRING MODULES ATEX Zone 2 This module must be mounted in an...

Page 12: ...on CPE330 operation refer to the PACSystems RX3i and RX7i CPU Reference Manual GFK 2222V or later 1 Turn power off at the RX3i rack and install the CPE330 in a double slot which is CPU compatible refe...

Page 13: ...rack The two screws are located at the bottom rear of the CPU module Tighten 7 Apply power to the rack Note When the ACC402 Energy Pack is powered up a period of time is required to charge it up to i...

Page 14: ...0 also serves as a drop in replacement for the CPU320 CRU320 and CPU315 Controllers without the need to upgrade PME To download projects intended for the CPU320 CRU320 to a CPE330 with versions of PME...

Page 15: ...Red 4 To toggle the compatibility setting press the RDSD DNLD button The compatibility indication will toggle between the Normal CPU320 and CRU320 compatibility patterns each time the RDSD DNLD butto...

Page 16: ...cation and storing the project to the CPE330 Note that CPE330s with firmware versions 8 45 through 8 60 support compatibility with the CPU320 and CPU315 only The compatibility setting using the RDSD b...

Page 17: ...during initial installation Should the RTC battery fail the CPU date and time will be reset to 12 00 AM 01 01 2011 at start up The CPU operates normally with a failed or missing RTC battery however t...

Page 18: ...erence Manual GFK 2950 PACSystems HART Pass Through User Manual GFK 2929 PACSystems Hot Standby CPU Redundancy User Manual GFK 2308 PACSystems RX3i PROFINET IO Controller User Manual GFK 2571 PROFINET...

Reviews: