31
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two
Phillips head screws.
8
SET THE CONTROLS
Set the controls to the recommended
setting.
9
START THE ICEMAKER
Set the icemaker power switch
to the
ON
position. The icemaker will
not begin to operate until it reaches
its operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days
to fill the ice bin.
10
Power
switch
SCREW DOWN SUPPORT LEG
Screw down the support leg until it
touches the floor. This will prevent door
misalignment.
7