Do not shorten the flexible conduit. The conduit strain relief clamp must be securely attached to 

the junction box and the flexible conduit must be securely attached to the clamp. If the flexible 

conduit will not fit within the junction box, do not install the oven until a clamp of the proper size 

is obtained.
NOTE TO ELECTRICIAN:

 The 3 power leads supplied with this appliance are UL recognized 

for connection to larger gauge household wiring. The insulation of these 3 leads is rated at 

temperatures much higher than the temperature rating of household wiring. The current carrying 

capacity of the conductor is governed by the temperature rating of the insulation around the wire, 

rather than the wire gauge alone.

Electrical Connections

 cont.

C

Reinstall Junction box cover.

C8

Summary of Contents for PD900

Page 1: ...ON INSTALLER All electric drop in ranges must be hard wired direct wired into an approved junction box A plug and receptacle is NOT permitted on these products If you have questions call 1 800 GE CARE...

Page 2: ...onal Electrical Code ANSI NFPA No 70 Latest Edition You can get a copy by writing National Fire Protection Association Batterymarch Park Quincy MA 02269 Effective January 1 1996 the National Electrica...

Page 3: ...when moving the unpackaged range Cooktop glass may be broken To obtain Kits a Visit GE Web Site See page 1 b Call GE Answer Center See page 1 c Contact Dealer Do not remove the protective channel from...

Page 4: ...Required Clearances A If cabinets are placed less than 30 min above the range see alternate construction 30 ranges conform to U L requirements for 0 spacing from vertical walls below countertops Allo...

Page 5: ...ge and voiding the warranty Center the 30 wide opening over the ad jacent cabinets and mark with a straight edge Using a straight edge mark the back line at 23 3 16 from the front edge of the counter...

Page 6: ...ED FROM THE LEADS NO CONDUCTOR SHALL BE EXPOSED IN THE CONNECTION THE EXCEPTION TO THE CONDUCTOR BEING EXPOSED IS THE BARE COPPER GROUND CONNECTION Position the range in front of the opening but sligh...

Page 7: ...l codes do not permit grounding through neutral Cut the neutral white lead from the crimp Re strip the neutral white lead to expose the proper length of conductor and connect it to the white or gray b...

Page 8: ...clamp of the proper size is obtained NOTE TO ELECTRICIAN The 3 power leads supplied with this appliance are UL recognized for connection to larger gauge household wiring The insulation of these 3 lead...

Page 9: ...n D1 Continued on following page 1 For 3 4 Counter 2 For 1 18 3 cm Counter 3 For 1 5 Counter 4 For 3 5 5 Alternate shown below anti tip installation alternate anti tip installation Interior Wall 1 4 M...

Page 10: ...nge into place carefully setting the side metal flanges under the glass on the edges of the countertop opening The protective channels must be in place if supplied during this operation D3 Countertop...

Page 11: ...the Stop Screw It is suggested that two people lift the range and carefully slide it towards the back of the opening When the range is approximately 1 from the back of the opening lift the front of t...

Page 12: ...uctionscont D NOTE The oven door is heavy You may need help lifting the door high enough to slide it into the hinge slots Do not lift the door by the handle D8 D9 Bottom Edge of Slot Hinge Arm Hinge N...

Page 13: ...diately Recheck the range wiring connections If change is made to connections retest again If no change is required have building wiring checked for proper connections and voltage It is recommended th...

Page 14: ...countertop front and the control panel ends See page10 D3 AA Island Installation When installing in an island or other non standard location countertop cutout dimensions must be according to page 5 Fo...

Page 15: ...15 NOTES...

Page 16: ...16 NOTES 31 10622 3 02 10 GE...

Reviews: