background image

CAUTION: 

The  breaker  must  be 

OFF 

before  it  i s  

connected.  If  the  breaker  is  charged,  press  the 

ON 

button  to  close  the  breaker  contacts,  then  press  the 

OFF 

button to open the contacts. 

ATTENTION: 

Le  disjoncteur  doit  etre  en  position 

OFF 

avant  qu'il  ne  soit  embroche.  Si  le  ressort  de 

fermeture  du  disjoncteur  est  charge,  fermer  les 
contacts  du  disjoncteur  par  action  sur  le  bouton 

ON, 

puis  appuyer  sur  le  bouton 

OFF 

pour  ouvrir  les 

contacts. 

4. 

Engage  the  1/.2-inch  square  end  of  the  racking 

shaft  with  the  supplied  wrench,  catalog  number 
TDORT, and  rotate the shaft  clockwise  to  draw  the 
breaker  into  the 

TEST 

or 

CONNECTED 

position, 

as  illustrated  in  Figure 

7. 

The  compartment 

position  indicator  is  shown  in  Figure  8. 

NOTE: 

If the  breaker  does  not  fit  the  structure,  check 

the  rejection  relationship,  illustrated  in  Figure  8, 

to 

verify  that  a  correctly  rated  breaker  is  being 

installed.  Table 

lists  the  correct  draw-out  substruc­

ture  for  each  breaker  frame. 

NOTE: 

Si le  disjoncteur  ne rentre  pas  dans  le  berceau, 

verifier  le  detrompeur  illustre  dans  les  figure  8,  qui 
empeche  !'insertion 

d'un  mauvais 

calibre 

de 

disjoncteur. 

La 

Table 

definis  le  berceau  convenable 

chaque  taille  de  disjoncteur. 

Figure 

4. 

Lifting Bar attached to a draw-out breaker for manual lifting. 

Power  Break®  II Circuit Breakers 

Draw-Out Breaker Installation 

Figure 

Lifting Bar attached to a draw-out  breaker for lifting with a 

hoist. 

Figure 

Breaker installed on rails,  ready to be pushed into  the 

substructure. 

www 

. ElectricalPartManuals 

. com 

Summary of Contents for Power Break II

Page 1: ...GEH 62718 Installation Instructions Power Break II Circuit Breakers Draw Out BOD 4000 Ampere Frames w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Page 2: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Page 3: ...ensure accuracy the information contained herein does not cover all details or variations in hardware and software nor does it provide for every possible contingency in connection with installation o...

Page 4: ...cutoff switch 2 4 Lifting Bar attached to a draw out breaker for manual lifting 3 5 Lifting Bar attached to a draw out breaker for lifting with a hoist 3 6 Breaker installed on rails ready to be pushe...

Page 5: ...the connected position fed through when the Secondary Disconnects Control power is provided through the secondary disconnects in the test and connected positions only All accessories terminate at dedi...

Page 6: ...208 SPHDOS08 SSD16X210 X216 SPSDOS16 SHD16X210 X216 SPHDOS16 SSD20X220 SPSDOS20 SHD20X220 SPHDOS20 SSD25X21 0 X220 X325 SPSDOS25 SHD25X210 X220 X325 SPHDOS25 SSD30X330 SPSDOS30 SHD30X330 SPHDOS30 SSD4...

Page 7: ...ment position indicator is shown in Figure 8 NOTE If the breaker does not fit the structure check the rejection relationship illustrated in Figure 8 to verify that a correctly rated breaker is being i...

Page 8: ...pplied wrench catalog number TDORT as illustrated in Figure 7 and rotate the shaft counter clockwise to withdraw the breaker to the TEST or DISCONNECTED position The compartment position indicator is...

Page 9: ...ressed air for blowing out equipment 2 Inspect buses and or terminal lug connections for signs of overheating or weakening of insulating supports Check indicating devices and mechanical and key interl...

Page 10: ...e equipment Lubrication All the areas subject to friction are liberally coated at the factory with Mobil 28 red grease If the contact surfaces the breaker power screw and the interlock pin are cleaned...

Page 11: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Page 12: ...GE Electrical Distribution Control General Electric Company 47 WoodfordAve Plainville CT 06062 GE 62718 0697 7997 General Electric Company w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Reviews: