10
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Pliers
Wire cutter/stripper
Metal snips
Spirit level
Aluminized
Duct tape
Safety glasses
120V 60Hz. 15 or 20 Amp,
2-wire with ground, properly
grounded branch circuit
Step ladder
Saber saw or Key Hole saw
Phillips screwdriver
Strain relief for
junction box
8" Round metal
duct, length to
suit installation
Hammer
Electric drill with 3/16" bits,
#2 Phillips head
Flashlight
UL listed wire nuts
REMOVE THE PACKAGING
CAUTION:
Wear gloves to protect
against sharp edges.
•
Remove the duct covers.
•
Remove the hardware bag, literature package
and other boxed parts.
•
Remove and properly discard the protective
plastic wrapping and other packaging materials.