Pre-installation Checks
For public disclosure
GFK-2847W 55
4 Pre-installation Checks
This chapter provides information and procedures to perform pre-installation checks of the QuickPanel
+
Operator
Interface. Before installing and using the QuickPanel
+
, complete the following procedures:
•
Unpacking and Inspection
•
Basic Setup
•
Initial Startup
•
Runtime Setup
•
Firmware Updates
•
Shutdown
4.1 Unpacking and Inspection
Upon receipt of the QuickPanel
+
Operator Interface, carefully inspect all shipping containers for damage. If any part of
the system is damaged, notify the carrier immediately. Save the damaged shipping container for inspection by the
carrier. It is the
consignee
’
s responsibility to register a claim with the carrier for damage incurred during shipment.
Note
For phone numbers and email addresses, refer to the section,
Contact Information
.
After unpacking the unit,
record all serial numbers
. These are needed to contact Customer Care during the warranty
period. Save all shipping containers and packing material for future transport or shipping. Verify that all system
components have been received and agree with the order. If the system received does not agree with your order,
contact Customer Care.
Before initial powerup, inspect the unit for loose or damaged components. If damage is found (such as bent component
leads or loose components), contact GE Intelligent Platforms for additional instructions.
Caution
Do not
apply power to the unit if it has visible damage. Applying power to a unit
with damaged components may cause additional damage.
Summary of Contents for QuickPanel+ IC755CxS06RDx
Page 6: ...6 GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 16: ...16 GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 24: ...24 GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 54: ...54 GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 65: ...Mounting and Installation For public disclosure GFK 2847W 65 IC755CxS15CDxMounting Holes ...
Page 87: ...Mounting and Installation For public disclosure GFK 2847W 87 IC755CxSxxCDxSD Card Location ...
Page 88: ...88 GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 96: ...96 GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 99: ...For public disclosure GFK 2847W 99 Secomea Products used with QuickPanel in Application ...
Page 105: ...For public disclosure GFK 2847W 105 ...
Page 112: ...GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 114: ...GFK 2847W For public disclosure QuickPanel Operator Interface User Manual Notes ...
Page 115: ...Appendix B Orderable Part Numbers For public disclosure GFK 2847W ...
Page 116: ......