Tools Needed
• Slotted screwdriver
• 5/16 Nut driver
• Pliers
INSTALLATION NOTES
Reference Installation Instructions in the
Zoneline Owner’s Manual.
Branch circuit wires can be run from the sub-
base, up the chaseway and into the junction
box where connections are made. Electrical
connections can be made directly to the branch
circuit using properly rated wire nuts or plugging
the appropriate non-LCDI power cord into the
receptacle in the sub-base.
See additional Installation Instructions with the
sub-base kit and junction box kit.
Power supply kits or unit cords can be run from
the junction box, through the chaseway and into
the sub-base.
Parts Included
• Chaseway
• Mounting Screws (4)
• Chaseway Cover
Important Notes
• This kit provides for connection between sub-
base and junction box for wiring system in
accordance with the National Electric Code
ANSI/NFPA No. 70-2014.
• This kit is intended for use with sub-bases
RAK204U, RAK204D15*, RAK204D20*,
RAK204D30*, RAK204E15*, RAK204E20*,
RAK204E30* and Junction Box RAK4002C.
* All Series
Installation Instructions
for your new
Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.
RAK205CW
Chaseway Kit
WARNING
RISK OF ELECTRIC
SHOCK. Disconnect the electrical power supply
before wiring connections.
31-5000177 Rev. 0 10-18 GEA