SecoGear 24kV-27kV Air Insulation Switchgear
1
Safety first!
Important Recommendations:
•
Switchgear should be installed in a clean, dry, ventilated room.
•
Switchgear and/or switchboards should be installed in closed rooms suitable for electrical equipment.
•
Installation, operation and maintenance should be carried out by licensed electricians.
•
Fully comply with the applicable standards (e.g. IEC), the utility connection requirements and the applicable safety regulations.
•
Observe the relevant instructions in the instruction manual for all actions in relation to switchgear and switchboards.
•
Pay attention to the hazard notes in the instruction manual marked with this
warning symbol.
•
Make sure that the specified data are not exceeded under switchgear or switchboard operating conditions.
•
Keep the instruction manual accessible to all personnel involved in installation, operation and maintenance.
•
The users must act responsibly in all matters affecting safety at work and correct handling of the switchgear.
Warning
•
Always follow the instruction manual and respect the rules for good engineering practice!
•
Hazardous voltage can cause electrical shocks and burns.
•
Disconnect power, then earth and short-circuit before proceeding with any work on the equipment.
If you have any further questions about this instruction manual,
our field team will be pleased to provide the required information.
GE Energy reserve all rights to this publication. We do not accept
any responsibility for the information provided, which is subject to
alternation.