SecoGear 24kV-27kV Air Insulation Switchgear
5
Upon Receipt
The responsibilities of the consignee when the switchgear arrives at the site include, but are not limited to, the following:
Check the consignment is complete and without damage (e.g. look for any adverse effect caused by moisture). In case of doubt, the
packing must be opened and then properly resealed with new drying agent bags (when intermediate storage is necessary).
If any quantities are short, or defects or transport damage is noted, these must be;
•
Documented on the respective shipping document
•
Notified to the relevant carrier or forwarding agent immediately in accordance with the relative liability regulations
Note:
Always take photographs to document any major damage.
Intermediate storage
Intermediate storage should follow the following practices to avoid any negative consequences:
Panels with basic packing or without packing
•
A dry well-ventilated storeroom with a climate in accordance
with IEC62271-1:2007
•
Store the panels upright
•
Do not stack panels
Panels with basic packing;
•
Open the packing, at least partially
Panels without packing;
•
Loosely covered with polythene
•
Ensure that there is sufficient air circulation
Check regularly for any condensation during storage.
Panels with seaworthy or similar packing with internal protective
covers
•
Store the transport units
a.
Protected from the weather
b.
In a dry place
c.
Safe from any damage
•
Check the packing for damage
•
Check the drying agent;
d.
On arrival of the consignment
e.
Subsequently at regular intervals
When the maximum storage period (starting from the date of packing) has been exceeded
•
The protective function of the packing can no longer be guaranteed
•
Take suitable action if intermediate storage needs to be continued
Warning
Do not walk on the top of the panels (due to rupture points in pressure
relief devices) ! The pressure relief devices can be damaged!