Scenario PRE A001 - Pre-installation Procedures
Page no. 363
Chapter 5
SC-PRE-A001.fm
Scenario PRE A001 - Pre-installation Procedures
Chapter 5
1
CONTEXT
This scenario provides a check list for use in planning and carrying out pre-installation work.
2
STEERING GUIDE
#
Requirement
Reference
Who?
Done?
Pre-purchase site visit
1
Visit the proposed site to check for any potential
problems associated with installation.
Scenario PRE A002 - Pre-
purchase Site Visit
GEMS sales rep-
resentative
Purchase Senographe system
2
Order Senographe system with all appropriate
options from the Price Book.
For customers in all countries except China,
order the optional line supply cable. For custom-
ers in China, order an equivalent CCC-certified
line supply cable from the Price Book. For more
information see
GEMS sales rep-
resentative
3
If the floor thickness is less than 120 mm and/or
the installation is in a seismic area, order different
anchoring bolts to those that are supplied with
the system.
Installation planning visit
4
Visit site to assess installation requirements and
specify the preparatory work required before
delivery and installation.
Scenario PRE A003 -
Installation Planning Visit
GEMS site plan-
ner
Preparatory work
5
Hospital or third-party contractors carry out pre-
paratory work.
Hospital
Pre-delivery check
6
Visit site to confirm that the preparatory work is
satisfactory and the site is ready for delivery and
installation.
Scenario PRE A004 - Pre-
Delivery Check
GEMS site plan-
ner
Delivery and storage
7
System delivery to designated storage.
Chapter
Delivery person-
nel and hospital
Installation
8
System installation.
GEMS installa-
tion engineers