GE Healthcare
Senographe DS Acquisition System
Revision 1
Operator Manual 5307907-3-S-1EN
Startup and Shutdown
6-startup.fm
Page no. 49
Chapter 6
Chapter 6 Startup and Shutdown
1
Startup procedure
To power up the system, press the power switch
I
on the X-ray Console. Power is applied to the whole sys-
tem (Gantry, Control Station, Digital Detector, etc.); green power indicators are lit on the Generator, the Con-
trol Station, and the monitor.
•
A series of system initialization messages appears on the Workstation screen, then the
Login:
prompt is
displayed. Type
sdc
(all lower case) followed by
<Enter>
. The AWS login screen shown below is dis-
played after a short delay.
•
Enter your user name in
Login ID
field. Then enter your password as provided by the system administra-
tor.
Note:
When the system is delivered two accounts are available:
-
A user account; user name
clinical
, password
clinical
.
-
An administrator account; user name
admin
, password
admin
.
FOR
TRAINING
PURPOSES
ONLY!
NOTE:
Once
downloaded,
this
document
is
UNCONTROLLED,
and
therefore
may
not
be
the
latest
revision.
Always
confirm
revision
status
against
a
validated
source
(ie
CDL).