GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A194 - AC/DC Module
Page no. 1153
Chapter 9
JC-DR-A-194.fm
Job Card D/R A194 - AC/DC Module
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
•
When handling circuit boards, take precautions against damage by ESD (electro-static discharge).
5
PREREQUISITES
None
6
PROCEDURE
6-1
Remove the Defective AC/DC Module
1. Switch off the Senographe electrical power.
2. Remove the left column cover; refer to
Job Card PHY A044 - Remove/Reinstall Gantry Covers
3. Lift the top metal panel (1) up using its handles (2) to release it from the framework. Hook it on to the