GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A223 - Rotation Optical Fork
Page no. 1231
Chapter 9
JC-DR-A-223.fm
Job Card D/R A223 - Rotation Optical Fork
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 75 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5
PREREQUISITES
•
Switch off the Gantry power.
•
Remove the front covers (Refer to
A044 - Remove/Reinstall Gantry Covers
•
Loosen and remove the Gantry curtain (refer to
Card D/R A208 - Gantry Curtains
) to
access the Optical Fork (1).
1