GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A250 - Compression Board
Page no. 1323
Chapter 9
JC-DR-A-250.fm
Job Card D/R A250 - Compression Board
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 40 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5
PREREQUISITES
•
Switch off the Gantry power.
•
Remove the Compression arm covers (Refer to
Card PHY A044 - Remove/Reinstall Gantry Covers
) to access the Compression Board (1).
1