GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job card D/R A252 - Compression Trolley Kit
Page no. 1337
Chapter 9
JC-DR-A-252.fm
Job card D/R A252 - Compression Trolley Kit
Chapter 9
1
SUPPLIES
(comprising Paddle Holder, and W304B Cable)
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5
PREREQUISITES
•
Switch off the Gantry power.
6
PROCEDURE
1. Remove the Compression Carriage covers (refer to
).
2. Remove the Compression trolley (refer to
Job Card PHY A044 - Remove/Reinstall
).
3. Change the old Compression trolley for a new Compression trolley (refer to
PHY A044 - Remove/Reinstall Gantry Covers
4. Replace the original Compression Carriage covers (refer to
Remove/Reinstall Gantry Covers
).