GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A290 - FOV Button
Page no. 1391
Chapter 9
JC-DR-A-290.fm
Job Card D/R A290 - FOV Button
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 15 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5
PREREQUISITES
None
6
PROCEDURE
6-1
Disassembly of the FOV Buttons
1. Switch off the Senographe electrical power.
2. Remove the tube head covers; refer to
Job Card PHY A044 - Remove/Reinstall Gantry Covers
3. Disconnect the W510 cable from the J4 connector on the Tube Tilt board.
4. Remove the allen screws (1) on each side of the Tube Head (3 mm allen wrench).
1
1