GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A332 - UPS Battery Replacement
Page no. 1529
Chapter 9
JC-DR-A-332.fm
Job Card D/R A332 - UPS Battery Replacement
Chapter 9
1
SUPPLIES
Battery
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 4.5 hours
4
SAFETY PRECAUTIONS
WARNING
Before starting, shut down the equipment correctly and switch off the Senographe system
hospital supply circuit breaker. Lock it in the off position or mark it clearly with a warning
sign to prevent others from applying power
.
5
PREREQUISITES
Remove the Control Station Omega cover (see
Job Card PHY A040 - Remove/Reinstall Control Station
6
PROCEDURE ON V1/V2 CONTROL STATIONS
6-1
Disassembly of the UPS Battery on a V1/V2 Control Station
1. Remove the UPS from the Control Station (see
section
Disassembly of the UPS on V1/V2 Control Stations
To disassemble the UPS battery, you must do the following:
1. Switch off the electrical power supply from the Mains Distribution Panel in the room. Wait 10 min-
utes for the Battery to discharge.