GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A403 - Capacitor Box
Page no. 1553
Chapter 9
JC-DR-A-403.fm
Job Card D/R A403 - Capacitor Box
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4
SAFETY PRECAUTIONS
Steps in this Job Card tell you when to take appropriate action to avoid electric shock.
•
Switch off the mains power supply.
•
Check the residual voltage (inverter supply).
5
PREREQUISITES
None
6
PROCEDURE
6-1
Removal of Filtering Capacitors
Refer to Illustrations1 and 2 at the end of this Job Card.
1. Switch off the electrical power supply from the Mains Distribution Panel in the room. Apply an appro-
priate LOTO padlock and label. Wait 10 minutes for the components within the Generator to dis-
charge.
2. Remove the four Generator side panels (see
Job Card PHY A042 - Remove/Reinstall Generator
) to reveal the capacitor box.
3. Switch off the electrical power supply, on the rotary switch in the Generator cabinet (position 0).