Job Card D/R A412 - Anode Starter Board 300-PL2
Page no. 1609
Chapter 9
JC-DR-A-412.fm
Job Card D/R A412 - Anode Starter Board 300-PL2
Chapter 9
1
SUPPLIES
•
2
TOOLS
•
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 20 minutes
4
SAFETY PRECAUTIONS
Steps in this Job Card tell you when to take appropriate action to avoid electric shock.
5
PREREQUISITES
None
6
PROCEDURE
6-1
Removal of the Anode Starter Board 300-PL2
1. Switch off the electrical power supply from the Mains Distribution Panel in the room. Apply an appro-
priate LOTO padlock and label. Wait 10 minutes for the components within the Generator to dis-
charge.
WARNING
It is important that you switch off the external power supply on the Mains Distribution
Panel. This is because you will be working in close proximity to where the external voltage
arrives into the Generator.
2. Remove the four Generator side panels (see
Job Card PHY A042 - Remove/Reinstall Generator
) to reveal the Anode Starter board 300-PL2.
3. Switch off the electrical power supply on the rotary switch in the Generator cabinet (position 0).