GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Cable Lay-out and Pin-out
Page no. 303
Chapter 3
Cables.FM
1-21. W120 - Serial Link RX Generator from Interface Board
Generator Interface J6 to Interface Board PL104 J10.
1-22. W121 - Grid Sync Generator to Interface Board
Interface Board PL104 J8 to Generator (Grid sync.) J19.
1-23. W123
- Terminal Block Interconnection
Terminal block ST102 from B/1 to P’.
1-24. W124 - AC Supply to Gantry
Generator J7 to Terminal 1 ST101-3.
1-25. W125 - 12 V DC Supply to PDU Board and Generator Shutdown Signal
PDU Board PL101 J2 to Generator.
If the error
152/001
12VDC Generator voltage off
occurs, there may be an issue with the W125 Cable, PDU
Board, or the Generator Supply Command board. For more information, refer to
.
Pin no. on
PL101
Functions
Location on Generator
PL 101 J2-1
HV Supply shutdown signal
Orange coupling block (which leads to
TB1-1)
PL 101 J2-2
HV Supply shutdown signal
Orange coupling block (which leads to
TB1-2)
PL 101 J2-3
12 V DC PDU Board supply from Generator
TP10 connector on
Supply Command Board 200PL2
PL 101 J2-4
GND
Top left ground bolt on
Supply Command Board 200PL2