GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Scenario PDR A001 - Post-D/R Procedures
Page no. 821
Chapter 9
SC-PDR-A-001.fm
Scenario PDR A001 - Post-D/R Procedures
Chapter 9
1
CONTEXT
•
D/R Job Cards are provided where required to describe part replacement procedures. They include
any checks and calibrations which must be carried out after replacement ("post-D/R").
•
Many part replacement procedures are relatively simple and do not require a D/R Job Card (e.g.,
some board replacements). However, the changing of the part can affect system operation and can
therefore require post-D/R calibration and check procedures.
•
This Scenario specifies post-D/R procedures required for part replacement not described in D/R Job
Cards.