Chapter 9
Page no. 824
SC-PDR-A-001.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Scenario PDR A001 - Post-D/R Procedures
•
The following calibrations and checks must be performed after replacement of this component:
Calibrations - Checks
Job Card
Tube Tilt Calibration
Job Card CAL A027 - Tube Tilt Calibration
Collimator Calibration
Job Card CAL A029 - Collimator Format Calibration
Collimation Check
Job Card ELE A028 - Collimation Checks
If Collimation Check not OK, repeat Collimator Calibration
Bad Pixel Calibration
Job Card CAL A041 - Bad Pixel Calibration
Gain calibration
Job Card CAL A043 - Detector Gain Calibration
flat field tests
Job Card ELE A032 – IQ Tools Flat Field Test
If IQ tests not OK, repeat all calibrations from Bad Pixel
Half Value Layer
Job Card CAL A046 - Half-Value Layer Measurement
Conversion Factor
Job Card CAL A045 - Conversion Factor Measurement
Use the same dosimeter as that used for CAL A046
AOP Calibration
Job Card CAL A051 - AOP Calibration
mAs non linearity
Job Card CAL A053 - mAs Non-linearity Calibration
AOP/SNR Check
Job Card ELE A038 - AOP Mode and SNR Check
If AOP/SNR check not OK, repeat all calibrations from AOP Calibration