SG Series 750 T12 UL S2
CAUTION !
Panel “A and B” should never be removed or replaced with power applied to the UPS.
These panels are in close proximity to 480V live buss bars.
Always disconnect the rectifier, bypass, load and battery sources from the UPS
before removing or replacing these panels.
If not serious injury or death could occur!
How to access the input /output and DC bus bars for the cable connections.
SGS_750_S2_U
PS connection_G
E_01_US
B
A
Bottom entry cables
!
Top entry cables
!
Rectifier cabinet
NOTE!
Remove this panel or provide
means to capture metal filings
from cutting conduit entry holes
NOTE!
Remove this panel or provide
means to capture metal filin
from cutting conduit entry h
4
3
13
2
1
12
10
21
1
11
22
7
18
9
8
20
19
6
5
17
16
4
3
15
14
2
4
1
3
2
1
2
Fig. 3.9.1-1 SG Series 750 & SG Series 750 T12 access to the input / output connections
To access input, output and
Battery Connections
proceed as follows:
•
Remove the protection panel “
A
”
.
•
Remove the UPS side panel “
B
”
.