Modifications reserved
Page 43/49
OPM_SGS_ISG_M75_M75_2US_V010.doc
Installation Guide
SG Series 750 UL S2
&
SG Series 750 T12 UL S2
SGS_750_RPA control bus cable_G
E_03US
Q1
Q1
JB1
JA2
unit 3,4,5,6
Next parallel
JB2
JA
JB
JB2
JB1
JA1
JA2
JA
JB
UPS 1
UPS 2
JA1
JB1
JA1
Fig. 3.10.3-3 Control Bus cable routing and connection
Control bus cables routing
Place and fix the cables
JA-1/2/3/4/5
and
JB-1/2/3/4/5
inside the UPS cabinets in the position
illustrated in the drawing
Fig. 3.10.3-3
.
NOTE !
Pay attention when cabling and routing the bus cables
JA
and
JB
inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables
JA
and
JB
must be removed from the cabinet without disconnecting them from the
metal plate where the sockets
JA
and
JB
are located
.
For reliability reasons the cables
JA-1/2/3/4/5
and
JB-1/2/3/4/5
connecting the units should be run
in separated protected conduits (as indicated in
Fig. 3.10.3-3
) separated from the power cables.
It is important that the cable
JA
must be the same length as cable
JB
.
WARNING !
Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a GE SERVICE ENGINEER from of your
Service Center
.