Modifications reserved
Page 38/49
OPM_SGS_ISG_M75_M75_2US_V010.doc
Installation Guide
SG Series 750 UL S2
&
SG Series 750 T12 UL S2
3.9.7 Setup for
SG Series 750
&
SG Series 750 T12
intended to be operated in eBoost™
Operation Mode
NOTE !
For systems intended to be operated in
eBoost™ Operation Mode
, the
installation shall be protected with suitable surge protection devices
(SPDs) on the AC bus feeding the UPSs.
Please contact your
Service Center
for more information.
When using the “eBoost/IEMi control” function on the programmable user
relays of the customer interface X1/J2 terminals in a Parallel System, a
separate NO (Normally Open) contact must be connected to each
individual unit.