Modifications reserved
Page 44/49
OPM_SGS_ISG_M75_M75_2US_V010.doc
Installation Guide
SG Series 750 UL S2
&
SG Series 750 T12 UL S2
4
CUSTOMER INTERFACE
Connectivity Rack
CR1
and
CR2
SGS_750_UPS
_CR1-CR2_01
Q1
CR2
CR1
18
2
19
20
89
7
22
11
1
21
10
2
1
2
3
4
3
4
14
15
34
16
17
56
12
12
13
1
SG Series 750
&
SG Series 750 T12
are
delivered with 2
Connectivity Rack
(CR1
and
CR2
).
CR1
Connectivity Rack with a
Customer Interface (see
Section
4.1)
CR2
Connectivity Rack for additional
Customer Interface (option)
WARNING !
The installation of the option
“Additional Customer Interface”
must be
performed by a
SERVICE ENGINEER
from of your
Service Center
.
The operation must be performed with the UPS system COMPLETELY SHUTDOWN.