4. Press
“
inverter on
”
( I ) key on first unit
.
•
Soft-start of
Inverter
, indicated with blinking
LED
.
•
At the end of Soft-start the
LED Inverter
remains lit.
•
In case of sufficient output power, the output will transfer to
Inverter
.
•
UPS output
LED
indicates
Load on Inverter
and
the
LCD
must display on the
main screen the status
“
LOAD ON INVERTER”
.
First operated unit
All other units of the system
5. Press
“
inverter on
”
( I ) key on all other units
.
(Do not start the next
Inverter
until the sequence of the previous ends)
•
As soon as the output power of the
Inverters
is sufficient to supply the
Load
, the
output of the units with running
Inverter
will transfer to
Inverter
.
•
All
LED’s Inverter
,
Load on Inverter
and
Load
supplied are ON.
First operated unit
All other units of the system
The
LCD
must display on the main screen on all
Units
the status
“
LOAD ON INVERTER
”
.
End of procedure
The
Battery
must be charged for at least 10 hours, in order to ensure the
full backup runtime in the case of a
Utility Failure
.