g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
59/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.3.5 Reconnect a Unit to a parallel system
1. Connect the Utility supply on the separated Unit
.
•
Press
mute
, to reset
alarm and buzzer
.
First operated unit
All other units of the system
2. Close Q1 (Pos. I) on the separated Unit
.
Rectifier
starts automatically.
First operated unit
All other units of the system
3. Connect the Battery, in case of External Battery, to the UPS on the separated
Unit by closing the external Battery Switch or Fuses
.
4. Press
“
inverter on
”
( I ) key on the separated Unit
.
After Soft-start of the
Inverter
, the
Inverter
connects automatically to the
other Units
of the parallel system.
•
The
LCD
must display on the main screen the status
“
LOAD ON INVERTER
”
.
First operated unit
All other units of the system
End of procedure