g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
72/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.4.5 Reconnect a Unit to a parallel system
1. Connect the Utility supply on the separated Unit
.
•
Press
mute
, to reset
alarm and buzzer
.
First operated unit
All other units of the system
2. Connect the Battery to the UPS separated by closing the external Battery
Switch or Fuses.
3. Close Q1 (Pos. I) on the separated Unit
.
Rectifier
starts automatically.
First operated unit
All other units of the system
4. Press
“
inverter on
”
( I ) key on the separated Unit
.
After Soft-start of the
Inverter
, the
Inverter
connects automatically to the
other Units
of the parallel system.
First operated unit
All other units of the system
End of procedure