Installation Guide
SG Series 10-20-30-40 UL S
To unpack the cabinet packaged in
Wooden Crate
follow the instructions below:
1
2
Make sure to have sufficient space
around the UPS before you start
unpacking.
Remove the wooden sides
“
A
”
and
“
B
”
loosening the
appropriate screws.
Remove the protection
“
C
”
outside the cabinet and the
accessories bag.
Remove the wooden support “
D
”, which must be used
to hoist the UPS.
Unscrew anchoring bolt “
E
” from plate on all four legs.
3
4
Position the fork lift
“
F
”
with an opening
between the forks of 33.50” (850mm).
Insert the wooden support
“
D
”
underneath the UPS, paying attention
that the 2 guides
“
D1
”
are positioned
with the UPS in the center.
Lift the UPS cabinet.
Remove the wooden pallet
“
G
”
.
Loosen the 4 screws
“
H
”
and remove then the 4
anchoring plates
“
I
”
.
Put the UPS down on the floor.
Remove finally the wooden support
“
D
”
.
Included in the delivery you can find the following parts:
An accessories bag
Control Bus cables (only for RPA parallel system)
NOTE !
A damaged UPS must never be installed or connected to
mains
or
battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
Packing material recycling
GE
, in compliance with environment protection, use only environmentally
friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.