Critical Power
Modifications reserved
Page 27/46
GE_UPS_OPM_SGS_ISG_10K_40K_0US_V070.docx
Installation Guide
SG Series 10-20-30-40 UL S
3.8.2
Power connection with common input utility of
SG Series 10 & 20
Fig. 3.8.2-1 Power connections Common Input Utility of SG Series 10 & 20
SG Series 10 & 20
Max. rating
X1
terminals:
3 AWG
(25mm
2
)
Common Input Rectifier / Bypass
L1-1
Rec Bypass Phase A
L2-1
Rec Bypass Phase B
L3-1
Rec Bypass Phase C
N
Neutral
PE
Ground
Output Load
L1
Load Phase A
L2
Load Phase B
L3
Load Phase C
N
Load Neutral
PE
Load Ground
The interconnection links
BR1
,
BR2
and
BR3
MUST REMAIN CONNECTED
.
Cable terminations are to the
Rectifier Input Terminals
and
Output Terminals
as shown above.
Connect wire to the
Terminals
using appropriate tools and appropriate torque.
Torque specification for
Input / Output
and
DC
power connections on
Terminals
: see Sec
tion 3.8.1
.
NOTE !
This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.
SGT
50
00_0
10-020_U
P
S
c
onne
c
tion
c
o
m
m
on
_01US
N
L1-1
1 -
INPUT
LOAD
PE
L3-1
L2-1
N
L2
L1
L3
RECTI
F
IER
X1
PE
&
BYPASS