GE Analytical Instruments ©2010
129 of 226
DLM 74001-04 Rev. A
Chapter 6: Calibration and System Protocols
11. If you have a Super
iOS
system, and selected the
After
or the
Before and After
option, the Analyzer will
prompt you to remove the standards, and to insert the rinse cartridge or vials into the Super
iOS
system
to continue the Rinse activity. Take out the rinse cartridge or vials when completed.
12. If you have a standard
iOS
System, remove the standards and slide the
13.
iOS
door closed.
Figure 31: System Suitability Summary Screen
JP Protocol
Use this protocol to verify that the Sievers 500 Series TOC Analyzer meets the testing requirements outlined by
the Japanese Pharmacopeia (JP) monographs; JP <2.59> Total Organic Carbon (TOC) for Water Injection and
Purified Water and JP <2.51> Conductivity (COND).
1. (Optional) If DataGuard is enabled, log in to the Analyzer with a UserID that has a User Level of Quality
Assurance or Administrator and the appropriate Password. If Password protection is enabled, log in to
the Analyzer with the UserID and Password.
NOTE:
Before you begin this protocol, ensure that you have selected the
appropriate Pharmacopeia setting. Refer to “Specifying the Pharmacopeia”
on page 91. To run this protocol for JP TOC
only
, you must first select the
JP
TOC
button on the
Pharmacopeia
screen (
Menu
>
Maintenance
>
Advanced
>
Advanced Setup
>
Pharmacopeia
).
To also run this protocol for JP Conductivity, select the
JP Cond
button. The
JP
Cond
button will set up the Analyzer for both JP TOC and JP
Conductivity.
To run the protocol for JP Conductivity, you must also ensure that the
temperature of the conductivity cell inside the instrument is less than 30
°
.
Summary of Contents for Sievers 500 RL
Page 8: ...GE Analytical Instruments 2010 8 of 226 DLM 74001 04 Rev A ...
Page 10: ...GE Analytical Instruments 2010 10 of 226 DLM 74001 04 Rev A ...
Page 36: ...GE Analytical Instruments 2010 36 of 220 DLM 74001 04 Rev A ...
Page 66: ...GE Analytical Instruments 2010 66 of 226 DLM 74001 04 Rev A Chapter 3 Installation ...
Page 152: ...GE Analytical Instruments 2010 152 of 226 DLM 74001 04 Rev A Chapter 7 Maintenance ...
Page 170: ...GE Analytical Instruments 2010 170 of 226 DLM 74001 04 Rev A Chapter 8 Troubleshooting ...
Page 178: ...Appendix A GE Analytical Instruments 2010 178 of 186 DLM 74001 04 Rev A ...
Page 185: ...Notes GE Analytical Instruments 2010 185 of 186 DLM 74001 04 Rev A 186 ...
Page 186: ...Notes GE Analytical Instruments 2010 186 of 186 DLM 74001 04 Rev A 186 ...