background image

GEH-5973A

INSTRUCTIONS

StreetDreams

™ 

Pendant

READ THOROUGHLY BEFORE INSTALLING

SAVE THESE INSTRUCTIONS FOR FUTURE USE

WARNING

Risk of electric shock

Turn power off before servicing

CAUTION

Risk of burn

Do not touch operating luminaire

CAUTION

Risk of injury

Wear safety glasses and gloves

during installation and servicing

GENERAL

This luminaire is designed for outdoor lighting applications, and

should not be used in areas of limited ventilation, or in high ambient

temperature enclosures; it should be installed and maintained ac-

cording to the following recommendations.

Make all electrical connections in accordance with the National

Electric Code and any application local code requirements.

UNPACKING

This accessory has been properly packed so that no parts should

have been damaged during transit. Inspect to confirm.

INSTALLATION

Mounting

Note:  Power leads should be pulled as mounting parts are

assembled, verifying that leads are free and not pinched.

When mounting a slip fitter to a mounting arm it is required that

this mounting arm and slip fitter be grounded per applicable

codes.

A . MOUNTING SLIPFITTER TO HORIZONTAL ARM

1.

When mounting to a horizontal arm (2-3/8” OD pipe) the bottom

of the arm should be pre-drilled with a 3/8” - 1/2” clearance hole,

2” from the end.  The slip fitter should then be slid completely

onto the arm until it reaches the internal stop.  Align the bottom

hex-head screw with pre-drilled hole and fully engage bolt.

The two mounting bolts should be oriented to the top of the arm

and tightened to 12-15 foot-pounds.  See Figure 1.  The slipfitter

is provided with a 1-1/2” NPT threaded pipe nipple which is to

be inserted into leveling device or directly into top casting (de-

pending on the luminaire configuration ordered) and jam nut

fully tightened.  See Figure 2.

Figure 3

2.

For those slipfitters supplied with a photoelectric (PE) control
receptacle, supply wiring should be pulled through the arm,
slipfitter and into the top casting prior to threading top casting
to slipfitter.  Feed the wiring from photoelectric control into top
castings.  Once top casting is installed onto arm (see A. INSTAL-
LATION OF LUMINAIRE) supply wire should be connected to the
terminal board then connect PE wiring via connector (see WIR-
ING instruction for proper routing and connection).

Photoelectric control receptacle should be oriented before control

is installed.  Loosen and remove the two screws and rotate until

“North” label is directed as near to true north as possible.  Replace

and tighten screws and install control.  See Figure 3.

A . INSTALLATION OF LUMINAIRE

Depending on the configuration ordered the luminaire is pro-

vided with either the top casting or a leveling device tapped to

accept a 1-1/2” NPT threaded connection.  To avoid twisting

wires it is recommended that the wing nut securing the top

casting be loosened and the casting rotated around the hinge

Orient To North

Slipfitter

Figure 1

Figure 2

Optional Finial
or Cap

Mounting Bolts

Slipfitter

1-1/2in. NPT
Threaded Pipe

2.000

.500

DIA

2.375 O.D.

PIPE

These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation, operation or
maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred
to GE Lighting Solutions.

g

GE
Lighting Solutions

Reviews: