30
GE Oil & Gas
ValVue SVI II AP Quick Start
Installing the SVI II AP for Double- Acting Operation
This section explains how to mount the SVI II AP for the 84/85/86 kit for double-
acting valve positioner configurations.
To mount the kit:
1. Set valve to the closed position.
2. Install the mounting assembly to the yoke (Figure
14) using helical spring
washer 5/16, flat washer 5/16 and hex screw 5/16-18x44.5 [1.75] LG.
Lever
Rod-end
Kit Mount
Bracket
Figure 14
84/85/86 Valve
NOTE
Mount all components snug enough to stay in place but loose
enough to tap with rubber hammer into final position.
Summary of Contents for SVI II AP-2
Page 6: ...GE Oil Gas SVI II AP Quick Start Guide 6 ...
Page 10: ...10 GE Oil Gas ValVue SVI II AP Quick Start This page intentionally left blank ...
Page 64: ...64 GE Oil Gas ValVue SVI II AP Quick Start This page intentionally left blank ...
Page 90: ...90 GE Oil Gas ValVue SVI II AP Quick Start Spare Parts ...
Page 91: ...91 Specifications and Spare Parts ...