45
3
Overview
This section provides the calibration procedures to ensure proper valve
positioning. Operational checkout, configuration and calibration procedures are
described using an SVI II AP that has a display with pushbuttons.
NOTE
Perform all procedures in this section before
putting the SVI II AP into operation.
Check Out Procedures
SVI II AP checkout consists of physical and operational checkout procedures. The
physical checkout procedures include:
“Inspecting Actuator, Linkages, or Rotary Adapter” on page
46
“Verifying Mounting and Linkage Adjustment” on page
46
“Checking the Magnet” on page
46
“Checking the Air Supply” on page
48
“Checking the Electronic Module Connections” on page
48
Check Out,
Configuration and
Calibration
Summary of Contents for SVI II AP-2
Page 6: ...GE Oil Gas SVI II AP Quick Start Guide 6 ...
Page 10: ...10 GE Oil Gas ValVue SVI II AP Quick Start This page intentionally left blank ...
Page 64: ...64 GE Oil Gas ValVue SVI II AP Quick Start This page intentionally left blank ...
Page 90: ...90 GE Oil Gas ValVue SVI II AP Quick Start Spare Parts ...
Page 91: ...91 Specifications and Spare Parts ...