Critical Power
Modifications reserved
Page 62/91
GE_UPS_USM_TLE_SUL_M16_M50_2bU_V010.docx
User Manual
TLE Series 160 - 500 UL S2B
NOTE !
Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.
It indicates that the DC-link 1 and DC-link 2 has reached 400Vdc (see screen MEASURES /
Rectifier)
!
2. Connect the Battery to the UPS by closing the
“External Battery Protections” and close, if
present, the “CB3 – External Battery switch”
(option).
NOTE !
Before performing the next procedure (3) make sure that the LED 3 (Booster/Battery
charger)
is lit.
3. Insert the Inverter performing the command “Inverter ON"
.
Perform the
“Inverter ON”
command from the screen:
Commands 1 / Inverter /
ON
.
•
Soft-start
of
Inverter
indicated with blinking
LED 2 (Inverter)
.
•
At the end of
Soft-start
the
LED 2 (Inverter)
remains lit.
•
The
Load
is automatically transferred from
Automatic Bypass
to
Inverter
.
•
LED ALARM
turns Off and the
LED LOAD PROTECTED
must be lit.
The
Synoptic Diagram
must display the status
“
LOAD SUPPLIED BY INVERTER”
.
END OF PROCEDURE