Critical Power
Modifications reserved
Page 17/53
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Installation Guide TLE Scalable Series 40 - 150 UL S1
TLE Scalable Series 40 - 150
Opening for input and output cable connections
Fig. 4.4.1-2 TLE Scalable Series 40 - 150
Opening on the bottom of the cabinet for input and output cable connections
TLE Scalable Series 40 - 150
provided an opening on the
bottom of the cabinet for the
connection of input and output
cables.
Pay attention to the position of
this opening when choosing the
placement of the UPS.
Fixing of the UPS cabinet
TLE Scalable Series 40 – 150
on the floor
The UPS cabinet is free standing and normally
does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the
floor by bolting it with the supporting blocks to
the floor.
Fig. 4.4.1-3 Fixing of the UPS cabinet on the floor
Fig. 4.4.1-4 TLE Scalable Series 40 - 150 – UPS cabinet floor fixing points
FRONTAL SIDE
Utility input
Load output
Battery
20.67"
525mm
1.48"
37.5mm
1.48"
37.5mm
8.
27
"
210
mm
22
.15"
56
2.
5m
m
3.64"
92.5mm
23.63"
600mm
34
.06"
865
mm
TL
ES
_U
L_
040
-1
50
_S
1_
U
PS
vi
ew
b
otto
m
_01U
S
TLES
_04
0-12
0_S
1_U
PS f
ixing
_GE
_02
FRONTAL SIDE
21.85"
555mm
0.89"
22.5mm
0.89"
22.5mm
28
.94"
73
5m
m
3.47"
88mm
23.63"
600mm
34
.06"
86
5m
m
1.65"
42mm
TL
ES
_U
L_0
40
-1
50
_S
1_
U
PS
fi
xi
ng
_01
Ø 0.53"
13.5mm