Installation Guide TLE Scalable Series 40 - 150 UL S1
4.8.2
TLE Scalable Series 40 - 150 - Power connection with Dual Input Utility
NOTE !
Connect a single input
Neutral
to
Bypass Utility
(inside the UPS, common
Neutral
for
Bypass
and
Rectifier)
.
Fig. 4.8.2-1 TLE Scalable Series 40 - 150 -
Power connection with Dual Input Utility
Power connection cables are connected to bus bars using M8 bolts.
The bolts of the connection cables must be tightened with a torque wrench at 195 Lb-in / 22 Nm.
Dual Input Utility - Rectifier / Bypass
L1-1
Rectifier phase A (L1)
L1-2
Bypass phase A (L1)
L2-1
Rectifier phase B (L2)
L2-2
Bypass phase B (L2)
L3-1
Rectifier phase C (L3)
L3-2
Bypass phase C (L3)
PE
Ground Input Utility
N
Neutral Input Utility
NOTE !
The interconnection links
BR1
,
BR2
and
BR3
on the input bus bars MUST BE
REMOVED (see
Fig. 4.8.2-3)
.
Output Load
L1
Load phase A (L1)
L2
Load phase B (L2)
L3
Load phase L3
N
Neutral Load
PE
Load Ground
External Battery
+
Positive pole of the battery
DANGER !
Before closing the "
External Battery Fuses
end/or Breaker
" during the commissioning of
the UPS, check the correct polarity of the
battery terminals!
-
Negative pole of the battery
PE
Battery cabinet ground
NOTE !
To meet standards concerning electromagnetic compliance, the connection
between the UPS and external
Battery
must be done by using a shielded cable or
suitable shielded (steel) conduit!
Battery
_
+
Q1
PE
L1 L2
Load
L3
L1-1 L2-1 L3-1
1 - Rectifier Utility
L1-2 L2-2 L3-2
2 - Bypass Utility
BR1
BR2
BR3
N
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST BE REMOVED
EP
O
EP
O
-
+
XA
Q1
TLES
_UL
_04
0-15
0_S
1_U
PS c
onn
ecti
on s
epa
rate
_01
US