GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx
User Manual
TLE Series 600 & 800 CE S1
8.3
PROCEDURES FOR TLE SERIES 600 & 800 PARALLEL SYSTEM
8.3.1
TLE Series 600 & 800 Parallel System start-up
WARNING !
Before proceeding to turn on the UPS system, ensure that the
AC
and
DC external
isolators
are OFF, and prevent their inadverted operation.
Ensure that the
Output Load distribution
can be powered and all the
Output
Isolators
are open.
This procedure must be performed for the first start-up following the installation, with the Parallel
System completely switched Off and not powered.
Open the front door on all UPS units and make sure that:
All the
connections
to the input/output terminals or bus bars of the UPS have been made correctly.
The
safety screens
are fixed in their position.
The switch
“
Q1
–
UPS Output
”
is open
(Pos. O) and the
“External Battery Protections”
must be open
(Pos. O).
Q1
UPS Output switch
LEDs on Synoptic Diagram
LED 1
Rectifier
LED 2
Inverter
LED 3
Booster/ Battery charger
LED 4 Automatic Bypass
LED 5 LOAD on UPS
LED ALARM
LED LOAD PROTECTED
Command Inverter ON
Command Inverter OFF
Command
Module shutdown
Command
Module shutdown RESET
Command
System shutdown
Command
System shutdown RESET
1. Switch-ON the Mains voltage, on all UPS units, from the input distribution (both Rectifier and
bypass if separated).
The UPS performs a
“Self
-
test”
.
A successful termination of the tests will be indicated with Overall test
results
“OK”
.
Commissioning cannot be continued should one or more tests result to
be negative. Please contact in this case your
Service Centre
.
At this stage the
Electronic Power Supply
and
Control Panel
are switched
ON and the
Buzzer
sounds.
Press
“MUTE”
key to reset
Acoustical Alarm
.
LED ALARM
remains lit.
Continue
►
TLE
S_
U
L_
100
0_
S1_
Sw
itch
Q1
_0
1
Q1
0 OFF
I ON