5.9.3
TLE Series 800 - Power connection with Common Mains Input
Fig. 5.9.3-1 TLE Series 800 - Power connection with Common Mains Input
Power connection cables are connected to bus bars using
M12 bolts
.
The bolts of the connection cables must be tightened with a torque wrench at
60 Nm
.
Fix the cables on accessory
“
A
”
with the enclosed cable ties.
Common Mains Input - Rectifier / Bypass
L1-1
Rec Bypass Phase L1
L2-1
Rec Bypass Phase L2
N
Mains Neutral
L3-1
Rec Bypass Phase L3
PE
Mains Ground
NOTE !
The interconnection links
BR1
,
BR2
and
BR3
on the input bus bars MUST REMAIN
CONNECTED (see
Fig. 5.9.3-1)
.
Output Load
L1
Load phase L1
L2
Load phase L2
L3
Load phase L3
N
Load Neutral
PE
Load Ground
External Battery connection
+
Positive pole of the battery
-
Negative pole of the battery
PE
Battery cabinet ground
Bolt Size / Torque: M10 / 40 Nm
DANGER !
Before closing the
“External Battery Fuses”
, verify for correct polarity of the
External
Battery
connection.
NOTE !
To meet standards concerning electromagnetic compliance, the connection
between the UPS and external
Battery
must be done by using a shielded cable or
suitable shielded (steel) conduit!
This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input bypass transformer, the secondary of the
transformer must be wye-configured with neutral solidly grounded.
Position of the bus bars for
cables input from the top of the UPS (see Section 5.9)
Q1
Load
L3
Load
L2
Load
L1
BR3
BR2
BR1
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST REMAIN CONNECTED
PE
!
L2-1
L3-1
N
Mains Neutral
Load Neutral
N
Mains Neutral
Load Neutral
1
Rectifier
Mains
Typical installation
using common NEMA
two hole lugs
A
L1-1
Typical installation
using common NEMA
two hole lugs
+
_
PE
TLES_600_S1_U
PS connection ba
ttery_01GB
Power Section cabinet
In/Out Section cabinet