5.9.4
TLE Series 800 - Power connection with Separate Mains Input
NOTE !
Connect a single input
Neutral
to
Bypass Mains
(inside the UPS, common
Neutral
for
Bypass
and
Rectifier)
.
Fig. 5.9.4-1 TLE Series 800 - Power connection with Separate Mains Input
Power connection cables are connected to bus bars using
M12 bolts
.
The bolts of the connection cables must be tightened with a torque wrench at
60 Nm
.
Fix the cables on accessory
“
A
”
with the enclosed cable ties.
Separate Mains Input - Rectifier / Bypass
L1-1
Rectifier phase L1
L1-2
Bypass phase L1
L2-1
Rectifier phase L2
L2-2
Bypass phase L2
L3-1
Rectifier phase L3
L3-2
Bypass phase L3
PE
Mains Ground
N
Mains Neutral (Bypass)
NOTE !
In this case, the interconnection links
BR1
,
BR2
and
BR3
on the input bus bars MUST
BE REMOVED. See
Fig. 5.9.4-2
.
Output Load
L1
Load phase L1
L2
Load phase L2
L3
Load phase L3
N
Load Neutral
PE
Load Ground
External Battery connection
+
Positive pole of the battery
-
Negative pole of the battery
PE
Battery cabinet ground
Bolt Size / Torque: M10 / 40 Nm
DANGER !
Before closing the
“External Battery Fuses”
, verify for correct polarity of the
External
Battery
connection.
PE
!
Position of the bus bars for
cables input from the top of the UPS (see Section 5.9)
Load
L3
Load
L2
Load
L1
L1-2
L2-2
L3-2
N
Mains Neutral
Load Neutral
N
Mains Neutral
Load Neutral
1
Rectifier
Mains
2
Bypass
Mains
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST BE REMOVED
(see Fig 5.9.4-2)
L1-1
L2-1
L3-1
Typical installation
using common NEMA
two hole lugs
Q1
A
Typical installation
using common NEMA
two hole lugs
+
_
PE
TLES_600_S1_U
PS connection ba
ttery_01GB
Power Section cabinet
In/Out Section cabinet