6-18
C70 Capacitor Bank Protection and Control System
GE Multilin
6.3 METERING
6 ACTUAL VALUES
6
The magnitudes of the raw differential current and compensated operating currents (in per-units of the differential CT) are
displayed for each phase.
e) NEUTRAL CURRENT UNBALANCE
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
CAPACITOR BANK
Ö
NEUTRAL CURRENT...
Ö
NEUTRAL CURRENT UNBALANCE 1(3)
The magnitudes of the raw neutral split-phase current and compensated operating current (in per-units of the ground CT
input) are displayed in this menu.
6.3.5 TRACKING FREQUENCY
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
TRACKING FREQUENCY
The tracking frequency is displayed here. The frequency is tracked based on the selection of the reference source with the
FREQUENCY AND PHASE REFERENCE
setting in the
SETTINGS
ÖØ
SYSTEM SETUP
ÖØ
POWER SYSTEM
menu. Refer to the
Power System
section of chapter 5 for additional details.
6.3.6 FLEXELEMENTS™
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
FLEXELEMENTS
Ö
FLEXELEMENT 1(16)
The operating signals for the FlexElements™ are displayed in pu values using the following definitions of the base units.
NEUTRAL CURRENT
UNBALANCE 1
Raw INsp: 0.0000 pu
Comp Iop: 0.0000 pu
TRACKING FREQUENCY
TRACKING FREQUENCY:
60.00 Hz
FLEXELEMENT 1
FLEXELEMENT 1
OpSig: 0.000 pu
Table 6–2: FLEXELEMENT™ BASE UNITS
dcmA
BASE = maximum value of the
DCMA INPUT MAX
setting for the two transducers configured
under the +IN and –IN inputs.
FREQUENCY
f
BASE
= 1 Hz
PHASE ANGLE
ϕ
BASE
= 360 degrees (see the UR angle referencing convention)
POWER FACTOR
PF
BASE
= 1.00
RTDs
BASE = 100°C
SOURCE CURRENT
I
BASE
= maximum nominal primary RMS value of the +IN and –IN inputs
SOURCE POWER
P
BASE
= maximum value of V
BASE
×
I
BASE
for the +IN and –IN inputs
SOURCE THD & HARMONICS
BASE = 1%
SOURCE VOLTAGE
V
BASE
= maximum nominal primary RMS value of the +IN and –IN inputs
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...