7-12
C70 Capacitor Bank Protection and Control System
GE Multilin
7.2 TARGETS
7 COMMANDS AND TARGETS
7
•
How often the test is performed
: Event driven. The test is performed when a device programmed to receive GOOSE
messages stops receiving. This can be from 1 to 60 seconds, depending on GOOSE packets.
•
What to do
: Check GOOSE setup.
•
Latched target message
: Yes.
•
Description of problem
: The ambient temperature is greater than the maximum operating temperature (+80°C).
•
How often the test is performed
: Every hour.
•
What to do
: Remove the C70 from service and install in a location that meets operating temperature standards.
•
Latched target message
: Yes.
•
Description of problem
: Abnormal restart from modules being removed or inserted while the C70 is powered-up, when
there is an abnormal DC supply, or as a result of internal relay failure.
•
How often the test is performed
: Event driven.
•
What to do
: Contact the factory.
TEMP MONITOR:
OVER TEMPERATURE
UNEXPECTED RESTART:
Press “RESET” key
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...