C70 Capacitor Bank Protection and Control System
GE Multilin
10.4 SETTING EXAMPLE
10 APPLICATION OF SETTINGS
10
•
Source 2 (tap 1) and source 3 (tap 2) are assigned with the VT banks and split window CT bank connected to the tap
point of two strings of the bank, providing a signal source for the voltage differential and phase unbalance functions.
The CT and VT connections shown in the figure above are assigned the following values in EnerVista UR Setup.
10.4.4 BANK UNBALANCE CALCULATIONS
The following values are used in unbalance calculations.
The impedance of one capacitor can:
(EQ 10.5)
The impedance of one capacitor element, with
n
= 6 capacitor elements per can:
(EQ 10.6)
The impedance of the top healthy capacitor string:
(EQ 10.7)
The impedance of the bottom capacitor can:
(EQ 10.8)
The total impedance of the healthy capacitor string:
(EQ 10.9)
The maximum line-to-neutral system voltage:
(EQ 10.10)
The maximum phase current of the healthy bank:
(EQ 10.11)
The maximum voltage across the healthy top section:
(EQ 10.12)
The maximum voltage across the healthy bottom section:
Z
C
c
V
C
2
Q
C
--------
11.62 V
(
)
2
500
10
3
–
×
vars
-----------------------------------------
270.05
Ω
=
=
=
Z
C
e
Z
C
c
n
-------
270.05
Ω
6
-----------------------
45.01
Ω
=
=
=
Z
C
s
Z
C
c
N
×
270.05
Ω
7
×
1890.35
Ω
=
=
=
Z
C
b
V
CN
2
Q
C
-----------
0.825 V
(
)
2
0.167 var
----------------------------
4.08
Ω
=
=
=
Z
C
t
Z
C
s
Z
C
b
+
1890.35
Ω
4.08
Ω
+
1984.42
Ω
=
=
=
V
max
V
C
N
×
V
C
N
×
Z
C
s
------------------
Z
C
b
×
+
11620 V
7
×
11620 V
7
×
1890.35
Ω
--------------------------------
4.08
Ω
×
+
81515.37 V
=
=
=
I
max
V
max
Z
C
t
2
⁄
--------------
81515.37 V
1984.42
Ω
2
⁄
----------------------------------
86.06 A
=
=
=
V
top
V
max
Z
C
s
×
Z
C
t
--------------------------
81515.37 V
1890.35
Ω
×
1984.42
Ω
----------------------------------------------------------------
81340.40 V
=
=
=
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...