iv
T60 Transformer Protection System
GE Multilin
TABLE OF CONTENTS
CONTACT INPUTS AND OUTPUTS................................................................3-14
TRANSDUCER INPUTS/OUTPUTS.................................................................3-22
CPU COMMUNICATION PORTS.....................................................................3-24
3.3 DIRECT INPUT/OUTPUT COMMUNICATIONS
FIBER: LED AND ELED TRANSMITTERS ......................................................3-31
FIBER-LASER TRANSMITTERS .....................................................................3-31
RS422 AND FIBER INTERFACE .....................................................................3-37
G.703 AND FIBER INTERFACE ......................................................................3-37
3.4 MANAGED ETHERNET SWITCH MODULES
MANAGED ETHERNET SWITCH MODULE HARDWARE..............................3-44
MANAGED SWITCH LED INDICATORS .........................................................3-45
INITIAL SETUP OF THE ETHERNET SWITCH MODULE...............................3-45
CONFIGURING THE MANAGED ETHERNET SWITCH MODULE .................3-49
UPLOADING T60 SWITCH MODULE FIRMWARE .........................................3-52
ETHERNET SWITCH SELF-TEST ERRORS...................................................3-54
4.1 ENERVISTA UR SETUP SOFTWARE INTERFACE
ENERVISTA UR SETUP OVERVIEW ................................................................4-1
ENERVISTA UR SETUP MAIN WINDOW..........................................................4-3
4.2 EXTENDED ENERVISTA UR SETUP FEATURES
SECURING AND LOCKING FLEXLOGIC™ EQUATIONS ................................4-9
SETTINGS FILE TRACEABILITY.....................................................................4-11
CUSTOM LABELING OF LEDS .......................................................................4-18
INTRODUCTION TO ELEMENTS......................................................................5-4
INTRODUCTION TO AC SOURCES..................................................................5-5
USER-PROGRAMMABLE FAULT REPORT....................................................5-42
Summary of Contents for UR T60
Page 10: ...x T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 14: ...xiv T60 Transformer Protection System GE Multilin 0 1 BATTERY DISPOSAL 0 BATTERY DISPOSAL 0 ...
Page 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 436: ...5 298 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 678: ...C 30 T60 Transformer Protection System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Page 688: ...D 10 T60 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Page 700: ...E 12 T60 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...