D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
Chapter 4 - General Procedures and Functional Checks
4-3
P R E L I M I N A R Y
4-2-2
Power ON/Boot-up
4-2-2-1
Warnings
NOTE:
When turning on a system from standby mode, it takes a few seconds before it responds. Do not push
the On/off button again during this period. A second push will initiate a full shutdown.Do not cycle the
Power ON/OFF switch ON-OFF-ON in less than five (5) seconds.
When turning OFF the Power ON/OFF switch, the Ultrasound system should de-energize completely
before turning the switch ON
NOTE:
Before performing Power ON or system reboot, disconnect any USB mass storage device from the
system (unless a Software Installation procedure is required and the appropriate software installation
storage device is connected).
DANGER
ALWAYS CONNECT THE ULTRASOUND SYSTEM TO A FIXED POWER
SOCKET WHICH HAS THE PROTECTIVE GROUNDING CONNECTOR.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS
THE SAFETY GROUND.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT
THE POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE
(WHERE REQUIRED).
CAUTION
THE ULTRASOUND SYSTEM REQUIRES ALL COVERS.
OPERATE THIS UNIT ONLY WHEN ALL BOARD COVERS AND FRAME PANELS ARE SECURELY
IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD SYSTEM
PERFORMANCE AND COOLING PURPOSES.
CAUTION
USE ONLY POWER SUPPLY CORDS, CABLES AND PLUGS PROVIDED BY OR DESIGNATED BY GE.
Summary of Contents for Venue R1
Page 477: ......